Monday, February 16, 2009
Kukar Build New Air Port
Kukar seems really serious to build the airport (the airport) in his district. Kukar Pemkab even have to prepare the land area of 1300 hectares in the Village District Jongkang Loa Kulu, a part of land that has been released about 300 hectares.
Meanwhile, funding for, Pemkab entrust the entire cost of the airport of origin to Hong Kong investors, PT. Golden Dragon. Ditanamkan total investment in airport projects is U.S. $ 150 million or Rp. 1.5 trillion (exchange rate U.S. $ 1 = Rp. 10.000, -). "This is the first airport in India that use Intra moda system, ie, combining land transportation routes, water and air. Even not be charged for funding through the budget, but the responsibility of the investor. We only provide the land alone, "said Regent Kukar H HR Syaukani when the exposure Kukar Airport in East Kalimantan Governor Office, on Wednesday.
Present in the delivery of exposure among this Kukar Airport East Kalimantan Governor Suwarna AF H, Assistant Sekprov Kaltim II H Nusyirwan Ismail, Member of DPRD Kaltim Darlis Pattolongi and James Tuwo.
Then comes the fist BAPPEDA Gafur Kaltim H Solomon and Chairman of the High T Sihite Kaltim. Kukar Pemkab of the present, among other fist Dishub Ir Bogel Alus, Head BAPPEDA Fathan Djoenaidi, Head PU Ir Sugiyanto and staff of the Information and Foreign Affairs Judith A Navarro Diputro.
Head of PU Kukar Ir Sugiyanto disclose, manufacture Airport was conducted four companies joined in the Consultant Engineering Consortium, the Graha Cipta Hadiprana (architecture, building construction), House of Indonesia (business plan), Dirgantara Indonesia (navigation, communication and safety), and Pakaraya (procurement of human resources, development of human resources).
According to him, in the direction Kukar this airport is Brisbane Airport, Australia. We apply a three-phase development for the first phase with a 2500 m long runway commenced the year 2008-2011. The second phase commenced year 2011-2015 to the last phase long runway can reach 3300 m with 240 flights.
"Hopefully in the first phase the airport this can dioperasionalkan. Moreover, the Pon XVII in 2008, it is likely we will kebut. But if not, we will not be forced, "said Sugiyanto.
Exposure senantiasanya have a question-answer session eventually eliminated, because the invitation comes not play an active role. In addition, the schedule is tight because of the Governor together with the activities reviewed in the preparation of embarkation Hajj Balikpapan. So after the fete entourage Pemkab Kukar, Governor Suwarna depart directly to Balikpapan.
Regent Syaukani opportunity to give a picture cenderamata airport to the Governor Suwarna AF, DPRD Kaltim, East Kalimantan and BAPPEDA Kaltim High Court, "who have got this cenderamata he should support the development of the airport," said Syaukani laughter greeted the direct invitation casual exposure. ans of transportation for coal that can be relied upon. Similarly with oil palm to the front and hopefully can carry passengers," he said.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment